County Scope of WorkProtest TimelineResponse DeadlineCAB Eligible Locations
Alamance CountyDec. 2 - 11:59 p.m. on Dec. 13 Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Alexander CountyDec. 2 - 11:59 p.m. on Dec. 13 Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Anson CountyDec. 2 - 11:59 p.m. on Dec. 13 Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Avery CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Ashe CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Beaufort CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Bertie CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Bladen CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Brunswick CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Buncombe CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Burke CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Cabarrus CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Caldwell CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Camden CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Carteret CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Caswell CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Catawba CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Chatham CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Cherokee CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Chowan CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Clay CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Cleveland CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Columbus CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Craven CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Cumberland CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Currituck CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Dare CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Davidson CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Davie CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Durham CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Edgecombe CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Franklin CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Graham CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Granville CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Greene CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Guilford CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Halifax CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Harnett CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Haywood CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Henderson CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Hoke CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Hyde CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Iredell CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Jackson CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Johnston CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Jones CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Lee CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Lincoln CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Macon CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Martin CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
McDowell CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Mitchell CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Montgomery CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Moore CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Nash CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
New Hanover CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Northampton CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Onslow CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Pamlico CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Pasquotank CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Pender CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Perquimans CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Person CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Pitt CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Polk CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Randolph CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Richmond CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Robeson CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Rockingham CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Rowan CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Rutherford CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Sampson CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Scotland CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Stanly CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Stokes CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Surry CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Swain CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Transylvania CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Tyrrell CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Union CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Vance CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Wake CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Warren CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Washington CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Watauga CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Wayne CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Wilkes CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Wilson CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Yadkin CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process
Yancey CountyDec. 2 - 11:59 p.m. on Dec. 13Response Form A: 11:59 p.m. on Jan. 21, 2025
Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025
To be updated upon completion of protest process