Active CAB Proposals
The following counties requested proposals from prequalified internet providers to build broadband infrastructure and provide service to unserved and underserved locations for the CAB program. Each county’s scope of work is linked below, along with the relevant deadlines.
Employees and representatives of NCDIT and the county will not discuss the contents of a scope of work with any prequalified provider or its representatives. Failure of a provider or any of its representatives to observe this restriction may result in disqualification.
Please refer to ncbroadband.gov/CAB for additional information about the CAB program, including instructions on submitting protests and bids.
County Scope of Work | Protest Timeline | Response Deadline | CAB Eligible Locations |
---|---|---|---|
Alamance County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Alexander County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Anson County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Avery County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Ashe County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Beaufort County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Bertie County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Bladen County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Brunswick County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Buncombe County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Burke County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Cabarrus County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Caldwell County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Camden County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Carteret County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Caswell County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Catawba County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Chatham County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Cherokee County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Chowan County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Clay County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Cleveland County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Columbus County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Craven County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Cumberland County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Currituck County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Dare County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Davidson County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Davie County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Durham County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Edgecombe County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Franklin County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Graham County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Granville County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Greene County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Guilford County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Halifax County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Harnett County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Haywood County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Henderson County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Hoke County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Hyde County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Iredell County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Jackson County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Johnston County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Jones County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Lee County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Lincoln County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Macon County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Martin County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
McDowell County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Mitchell County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Montgomery County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Moore County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Nash County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
New Hanover County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Northampton County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Onslow County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Pamlico County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Pasquotank County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Pender County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Perquimans County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Person County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Pitt County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Polk County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Randolph County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Richmond County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Robeson County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Rockingham County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Rowan County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Rutherford County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Sampson County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Scotland County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Stanly County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Stokes County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Surry County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Swain County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Transylvania County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Tyrrell County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Union County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Vance County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Wake County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Warren County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Washington County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Watauga County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Wayne County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Wilkes County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Wilson County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Yadkin County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |
Yancey County | Dec. 2 - 11:59 p.m. on Dec. 13 | Response Form A: 11:59 p.m. on Jan. 21, 2025 Response Form B and Proposal: 11:59 p.m. on Feb. 17, 2025 | To be updated upon completion of protest process |